Our UPS driver, humping to please ...
Ryno on the dyno. ...
4.6" bore Gen 2 ...
Another 124 ready to assemble. ...
New from R&R Cycle
M8 flywheel assemblies.
Balanced for force and coupling.
Ask Greg Dahl of GMS if they will take a pounding.
...
Today's work, M8 drag barrels. ...
Today's work, proofing a new base profile program
for an S&S 143 crankcase.
...
Today's work- finish Stage 4 head work. ...
With JCS Performance – I'm on a streak! I've been a top fan for 14 months in a row. 🎉 ...
...
This content isn't available right now
When this happens, it's usually because the owner only shared it with a small group of people, changed who can see it or it's been deleted....
...
New from R&R Cycle, flywheel assemblies for rock solid street and strip applications. Ask Gregg Dahl if these will hold up on the drag strip. ...
The 143" believer maker. ...
Opening up Ultima crankcase for 8-1/2" o.d. flywheels. ...
Today's work, removing 3/16" cast iron material in 45 seconds with twin boring head. ...
143" shop bike ...
See you there ...
Today's task, make tool to check stem protrusion. ...
We took a failed 131 back to 128" with an increase in torque and no loss in power. Drago 555 cam. ...
Big Jugs at their best. ...
This content isn't available right now
When this happens, it's usually because the owner only shared it with a small group of people, changed who can see it or it's been deleted.Donnie Hansen's 124" RKS ...
For sale, details to serious requests only. ...


Today's work, 4.800" bore Prostock cylinders. ...










